April 16, 2008, Finishing the Classroom Building: Interior Finishes

Chairs arrive for the seminar room
View of seminar room from the kitchen

View from inside seminar room
NW corner of classroom building

South facing porch on house
March 19, 2008, Finishing the Classroom Building: Exterior and Interior Finishes

Exterior siding and storefront windows at entrance of classroom building

Corridor to boardroom

Windows looking northeast from the boardroom
Kitchen in the classroom building

Computer lab (looking at concrete stain samples for hallways and kitchen)

Painting the seminar room

Northeast corner of seminar room
Southeast corner of seminar room
Looking out east from seminar room

Built-in cabinets along west wall of seminar room
Storefront windows and doors into seminar room

Patio east of seminar room
Patio east of seminar room

House west of classroom building
March 5, 2008, Delivery of Housing Units

Delivery of housing units

Delivery of housing units

Delivery of housing units

Looking into the kitchen

Looking into the interior of the house

Looking back at the housing units from the northwest corner of the classroom
Looking back at the housing units
Looking from the south, mid-slope up to the housing units
February 20, 2008, Construction of Housing Units and Finishing the Classroom

Foundation for housing unit

Foundations for 2 housing units
Foundation of housing unit with classroom in the background to the northeast
Finishing sheetrocking in the classroom building
February 13, 2008, Construction of the Classroom Building: Roofing, exterior, & interior work

Samples of interior finishes for the classroom building

View to the west from the entrance road

West side of classroom building

Northwest corner of classroom building
Mechanical units on the roof

Rooflines at entrance of classroom building
\
Interior drywall
Interior of seminar room in classroom building
February 6 , 2008, Construction of the Classroom Building: Roofing, exterior, & interior work

Driving up to the classroom building

Pergallo beside entrance to classroom building

Detail of beam, soffit, fascia, and roof on classroom building

East side of classroom building will have storefront picture windows
January 30, 2008, Construction of the Classroom Building: Plumbing and electrical installation

Electrician working in the classroom building

Water line installed in the classroom building
Electrical conduit installed in the classroom building

View of classroom from the northwest

Entrance to classroom building
View of classroom building from the northeast
January 16, 2008, Construction of the Classroom Building: Framing Continues

View of classroom from the northwest
North entryway into the classroom building
West side of classroom
Looking into classroom from the east
Looking out to the southeast from the classroom
January 9, 2008, Construction of the Classroom Building: Framing Continues

View from the west
View from the north
Inside classroom/conference room
Inside classroom/conference room
Looking east from classroom/conference room
Main entrance
January 2, 2008, Construction of the Classroom Building: Framing Continues

View of SGS existing and new buildings from approximately 1 mile to the east

Northeast Entryway

Southeast east corner post

Westside is built into the hill slope
View from the northeast
Looking down hallway between classroom space on the left and office spaces on the right
Looking into computer lab

Standing inside classroom space, walking towards hallway
December 19, 2007, Construction of the Classroom Building: Framing Begins

Concrete septic vault
Eastside, conduit and framing
Southwest corner framing
Looking inside from the southwest
December 10, 2007, Construction of the Classroom Building: Curing the Concete Floor
.jpg)
Southwest corner of classroom building as visited by prairie animals
.jpg)
Newly poured concrete slab blanketed from cold temperatures and snowfall

Looking from the southeast, blanketed concrete slab
_____________________________________________________________________________________________
December 6, 2007, Construction of the Classroom Building: Pouring the Concrete Floor
.jpg)
View from the southwest, pouring the concrete floor
.jpg)
View from the north, pouring the concrete floor
.jpg)
View from the southeast, the concrete floor
.jpg)
View from the northeast, the concrete floor
_____________________________________________________________________________________________
November 14, 2007, Construction of the Classroom Building: Installation of the Water Line

North side of classroom building

East side of classroom building

South side of the Classroom Building

Southeast corner of classroom building
Installation of the water line
_____________________________________________________________________________________________
November 7, 2007, Construction of the Classroom Building: Pouring the Foundation and Grading the Walking Path

North side of classroom building foundation
Looking from the northeast, west wall of the Classroom Building
Southeast side of Classroom Building Foundation
South side of Classroom Building Foundation

Southwest side of Classroom Building
Looking southwest at new classroom construction along walking path to existing headquarters
Looking back along walking path
Walking path from site of new facility to exisiting headquarters across WCR 114
_____________________________________________________________________________________________
October 2007, Construction of the Classroom Building: Lithology revealed as the classroom building site is prepared for a foundation

Lithology along NW edge of footprint for new classroom building shows round, lighter enclusion

Detail of lithology along NW edge of new classroom footprint

Detail of lithology along NW edge of new classroom footprint

Detail of lithology along NW edge of new classroom footprint
More Pictures Coming Soon!

11/13/07
|